Menu Toggle
  • a stainless steel door restrainer on the side of a building
  • the outside of a red building with a metal door restrainer
  • a close up of a metal door restrainer
  • a close up of metal screw fixings on a stainless steel door restrainer
1 2 3 4

Coffee Store, Bury St Edmunds

Supporting Brooks & Woods Ltd, Team BOYCO supplied our ‘Built to Last’ door restrainers for a popular coffee shop. 

Case Studies / Coffee Store, Bury St Edmunds

Contractor
Brooks & Woods LTD

the outside of a red building with a metal door restrainer
a stainless steel door restrainer on the side of a building

Project Scope

Located in the Arc shopping centre in Bury St Edmunds, the coffee shop provides a place for shoppers to relax and refresh. Due to it being a high-traffic area, there became a need for a solution to protect the front and back entrances.  

 

The BOYCO Way

Background 

Tried and trusted, BOYCO has supplied Brooks & Woods with door restrainers on previous projects. Due to this being a large customer, the contractors knew they could rely on our team to deliver high-quality, robust products to meet their customer’s needs. 

Bespoke Solutions 

After the initial enquiry, our team worked together to provide a solution for Brooks & Woods LTD.  Selected by the customer, we supplied our market-leading door restrainers in stainless steel with an integrated buffer, with one also featuring a glass infill panel 

Chosen to create a modern, professional aesthetic, stainless steel is also highly durable and can withstand daily use. Made with grade 316 stainless steel, it offers superior corrosion resistance and longevity, perfect for protecting against outdoor elements and any scratches or scrapes that could occur in the busy entryway.  

The integrated buffer provides additional protection. A high-traffic space, the front door of the coffee shop will be consistently opened throughout the day as shoppers visit the store, the buffer absorbs the impact of this, protecting the metal of both the door and restrainer, as well as maintaining the appearance and performance of the product.  

Project Success

Upon delivery of the door restrainers, Team BOYCO continued to work closely with the contractor to ensure a smooth completion. This resulted in a fantastic finished product for those who visit and work at the coffee shop.


Looking for more? Discover our range of door restrainers here. 
Working on a project? Get in touch with our friendly team here. 
the outside of a red building with a metal door restrainer
a close up of a metal door restrainer

Project Case Studies

1747328499421
Great Sutton Medical Centre, Ellesmere Port
View case study
a long row of metal racks in a locker room
Spen Valley Fire Station, Bradford
View case study
Llysfasi Campus, Coleg Cambria
View case study

Tendering?

Pre-contract
Let’s do it

Contract Awarded?

Pre-contract
Let’s do it

Ask us a question

Pre-contract
Let’s do it