Menu Toggle
  • 150121 Bro Alun Gwersyllt 39
  • 150121 Bro Alun Gwersyllt 9
  • 150121 Bro Alun Gwersyllt 44
  • 150121 Bro Alun Gwersyllt 7
1 2 3 4

Ysgol Bro Alun, Gwersyllt

Architects recommend Boyco cloakroom fittings and anti-drip worktops in supply-and-fit contract for North Wales school.

Case Studies / Ysgol Bro Alun, Gwersyllt

Client
Wrexham County Borough Council
Architect
Lawray Architects
Contractor
Read Construction
Sector
Primary School
Download Case Study

Boyco were commissioned to supply and install cloakroom fittings and Waterfall® anti-drip worktops for a two-classroom extension at Bro Alun primary school in North Wales. The results are impressive.

150121 Bro Alun Gwersyllt 9
150121 Bro Alun Gwersyllt 39

Adding Value from design through to installation.

“The architect had never used us before, but was keen to specify our products, which was very pleasing,” said Boyco Regional Manager Kevin Bond, explaining the background to our project to supply and fit coat hooks and bag trays, and anti-drip worktops for a two-classroom extension at Ysgol Bro Alun in Gwersyllt.

The made-to-measure cloakroom fittings were fully assembled when delivered, meaning less time spent on site for installation. They were available in the school’s colours and came with a lifetime guarantee, as well as having an anti-microbial finish.

The project took just four months from initial enquiry to handover. As well as the architect’s own research, our early collaboration with stakeholders (including the school headmaster) to discuss the project and review samples helped avoid potential issues.

The initial site survey also identified opportunities for Boyco to add value, based on our considerable experience and deep understanding of the education sector. Initially tasked with supplying our Waterfall® laminate worktops, which have a ‘bull-nosed’ edge to prevent spills and drips, we proposed incorporating a handwash basin into the scope of works to avoid potentially expensive design changes and/or retrofitting

Since the successful completion of the project, Boyco have been added to Read Construction’s approved supplier list.

150121 Bro Alun Gwersyllt 9
150121 Bro Alun Gwersyllt 44

I was really impressed with the scheme and the furniture installed. Read Construction also said how positive it was working with Boyco.

Lawray Architects


Project Case Studies

a resource area with grey cabinets with lockable doors and a sink
Millside Spencer Academy, East Leake
View case study
A laboratory room with several microscopes
The Graham Kerr Building, Glasgow
View case study
Full View of Lockers
Global Bank HQ, Central London
View case study

Tendering?

Pre-contract
Let’s do it

Contract Awarded?

Pre-contract
Let’s do it

Ask us a question

Pre-contract
Let’s do it