Menu Toggle
  • Inside of Green Z Locker
  • Blue Z Locker
  • Wooden Z Locker
  • Green Z Lockers Open
  • Grey Z Lockers
  • Blue Z Lockers Open
  • Green Lockers
  • Wooden Z Lockers
1 2 3 4 5 6 7 8

Global Bank HQ, Central London

A flagship collaboration project for Team BOYCO and contractors BW: Workplace Experts, we provided end to end project management for Global Bank HQ.

 

Case Studies / Global Bank HQ, Central London

Contractor
BW: Workplace Experts

Full View of Lockers
Inside of Green Z Locker

Project Scope

Situated in the city centre of London, Global Bank HQ offers a central space for their employees to collaborate within their working day.

A modern centralised building, the bank invests in the wellbeing of their staff which lead to the need to refresh their changing rooms.

 

The BOYCO Way

Background

A flagship collaboration project for Team BOYCO and contractors BW: Workplace Experts, we provided end to end project management for Global Bank HQ. Known for our attention to detail in delivering outstanding projects for not just local but UK-wide brands, the bank required a premium service as well as bespoke storage solutions for this project.

At BOYCO, it’s all about relationships and reputation, and we’re extremely proud to have been involved in this stunning project for such a prestigious client,”
said BOYCO’s Managing Director Damien Boyt.

BOYCO were commissioned to supply and fit bespoke s for the bank’s changing rooms. To ensure that we offered the most suitable solution possible, we followed a detailed process to understand the needs of the customer and their employees.

One request was that the environment needed to be comfortable yet functional; a place that is welcoming to bank staff whilst providing The space also needed to have sufficient locking mechanisms; this is to enable employees to have confidence that their belongings are secure due to it being a communal space.  Our design team opted to use CAM locks which allow each user of the locker to have single key access to their compartments.

Bespoke Products

BOYCO’s in-house design team selected our ‘Wet or Dry’ lockers, specifically the two compartment ‘Z’ locker (LDZ (SGL/AL)). An ingenious design, it separates wet/dry or clean/dirty clothes and provides long hanging space for both.

The ‘Z’ locker is also heavy duty, made with an aluminium carcass and Solid Grade Laminate door. These materials offer a long-lasting solution compared to standard steel or wooden lockers; both are non-corrosive and rust resistant. This is perfect for the bank locker room where showers are situated close by. Solid Grade Laminate in particular offers additional protection against scratches and scrapes, a great match for the high traffic changing room.

BOYCO’s renowned attention to detail covered everything, from the locking mechanisms to floor plinths. In this project styling was just as important as function. Liaising with both the customer and aluminium sheet suppliers, we provided a range of vibrant colours to create a bright area for employees, something of which Global Bank HQ specifically requested. Timescales were just as tight as the access for the central London location – but we delivered on time, in full.

Project Success

Following completion of the project, we received this fantastic feedback from BW: Workplace Experts:

“We were very impressed with the BOYCO team. They kept to their schedule and their site operatives were able to overcome any issues, and get the job done efficiently and safely. Highly recommended.”
Philip Kyriacou, Senior Project Manager, BW: Workplace Experts.

Team BOYCO are proud to have worked on such a monumental project and provided our superior storage solutions for Global Bank HQ’s changing rooms; creating a fantastic space for their employees.

Currently, working on a project? Browse BOYCO's full range here.

Blue Z Locker
Wooden Z Locker

Project Case Studies

a large kitchen with lots of counters and ovens
Cedar Mount Academy, Manchester
View case study
a school resource area with grey cabinets and a sink
Grappenhall Heys Primary School, Warrington
View case study
a resource area with grey cabinets with lockable doors and a sink
Millside Spencer Academy, East Leake
View case study

Tendering?

Pre-contract
Let’s do it

Contract Awarded?

Pre-contract
Let’s do it

Ask us a question

Pre-contract
Let’s do it